Construction of a slurry walls section of the light rail's Red Line in Tel-Aviv. The target was to create a reinforced wall for the light rail’s "cut and cover" tunnel that passes through the original Turkish railway line near Neve Tzedek. Slurry walls 100 cm thick and up to 22 meters deep were constructed.