The large project along the route taken by Golomb Street in Jerusalem, included the construction of a sunken road together with bridges and junctions. Along that route, the Lipsker&Co.Company installed hundreds of permanent soil anchors and factory injected soil nails with outstanding, long term protection against corrosion. Both vertical and horizontal anchors were inserted into highly fractured chalk rock, which necessitated injection of the cement grouting with constant monitoring of the pressure and anchor functioning using specialized electronic monitoring equipment developed in house by the Lipsker&Co. Company.